Features
Better dissolution and pressure holding performance with metal seal.
Accurate Dissolution Times Based on Salinity and Temperature Variables
Better pump-down ability with compact design
Large Bore Size – Resulting in Higher Flow Back and Faster Dissolution
Ultra-short length, 60% shorter
Compact Tool Length of 8” Results in Faster Dissolution and Less Material
Pressure rating up to 10,000 psi
Sets with Standard Baker 10 or Baker 20 Setting Tool
| Liner Data |
|
|
| Liner OD |
127 |
mm |
| Liner wall thickness |
9.2 |
mm |
| Metal grade |
N-80 |
|
| Liner ID |
108.6 |
mm |
| Liner Hanger Depth |
3755 |
m |
| Frac Data |
|
|
| Maximum well pressure (surface) |
10000 |
psi |
| |
|
|
| Completion Plug Data |
|
|
| The installation stage of the packer |
After Frac Job |
|
| The type of liquid during the installation of the packer tube |
Fresh Water |
|
| Formation Tempreture |
104 |
°С |
| Formation Pressure |
32.7 |
Mpa |
| Expected pressure at the wellhead |
|
Mpa |
| H2S content in the well |
|
% |
| Number of days that plug can withhold the pressure of 70 Mpa or 35 MPa for |
not less than 30 |
days |
| Full dissolution of the plug |
not longer than 90 |
days |
| Chloride content in formation fluid |
3 |
% |
| Type of kill fluid to create an additional safety barrier |
CaCl |
|
| The maximum permissible density of the kill fluid (safety barrier above the plug) |
1.25 |
g/cm3 |