Company News

Methods and systems of planning a procedure for cleaning a wellbore

Views : 533
Author : casing scrapers manufacturers
Update time : 2021-05-07 15:25:38
A method of planning a procedure for cleaning a wellbore by injecting a cleaning fluid from a reservoir into the wellbore includes detecting properties and conditions of fluids circulating between the reservoir and the wellbore; preparing a data set from the detected properties and conditions of the fluids circulating between the reservoir and the wellbore; simulating a cleaning operation model of injecting the cleaning fluid into the wellbore based on the data set; determining parameter settings of the simulated cleaning operation model that satisfy prescribed constraints; and producing the procedure for cleaning the wellbore based on the determined parameters. A system for conducting a procedure for cleaning a wellbore includes a sensor unit; a control unit; and a cleanup simulation system.
Related News
Read More >>
why wellbore clean-up ? why wellbore clean-up ?
May .13.2021
The application of horizontal well drilling and large-scale sand fracturing can secure an increased production in shale gas reservoirs despite
of frequent gas wellbore blockage
Running of a scraper before running a Liner hanger with packer Running of a scraper before running a Liner hanger with packer
May .07.2021
WELLBORE CLEANING SERVICES -SHARP RAZOR

Generally, I would run and set a liner hanger, and I would not make a scraper run, assuming the following:
New well
Inspected, drifted casing
The last operation on the well consisted of pulling out of the hole