Company News

WELLBORE SERVICE TOOLS

Views : 304
Author : WELLBORE SERVICE TOOLS
Update time : 2021-03-10 13:35:17
WELLBORE SERVICE TOOLS COMBINATION RUN SAVES EQUINOR OVER $43,000 USD

proposed combining these field-proven technologies to meet the objectives set for the operation: »

13 5/8-in. Intercept RBP  
13 3/8-in. – 13 5/8-in.  wellbore filter/junk catcher
Jetting Drain Sub – a single ball-activated jetting tool for the BOP/wellhead
Mag Tech® riser magnet to catch magnetic debris  Riser Techbrush to clean the ID of the riser During the planning phase and prior to running the job,

conducted internal Critical Well Reviews to capture possible risks with the planned operation. A pre-job meeting was also conducted with all involved personnel prior to the operation. As an additional cost reduction initiative, Halliburton utilized cementing personnel for the installation so that no additional personnel were required on location for the operation.
Related News
Read More >>
why wellbore clean-up ? why wellbore clean-up ?
May .13.2021
The application of horizontal well drilling and large-scale sand fracturing can secure an increased production in shale gas reservoirs despite
of frequent gas wellbore blockage
Methods and systems of planning a procedure for cleaning a wellbore Methods and systems of planning a procedure for cleaning a wellbore
May .07.2021
casing scrapers manufacturers Methods and systems of planning a procedure for cleaning a wellbore