Features
Better dissolution and pressure holding performance with metal seal.
Accurate Dissolution Times Based on Salinity and Temperature Variables
Better pump-down ability with compact design
Large Bore Size – Resulting in Higher Flow Back and Faster Dissolution
Ultra-short length, 60% shorter
Compact Tool Length of 8” Results in Faster Dissolution and Less Material
Pressure rating up to 10,000 psi
Sets with Standard Baker 10 or Baker 20 Setting Tool
Liner Data |
|
|
Liner OD |
127 |
mm |
Liner wall thickness |
9.2 |
mm |
Metal grade |
N-80 |
|
Liner ID |
108.6 |
mm |
Liner Hanger Depth |
3755 |
m |
Frac Data |
|
|
Maximum well pressure (surface) |
10000 |
psi |
|
|
|
Completion Plug Data |
|
|
The installation stage of the packer |
After Frac Job |
|
The type of liquid during the installation of the packer tube |
Fresh Water |
|
Formation Tempreture |
104 |
°С |
Formation Pressure |
32.7 |
Mpa |
Expected pressure at the wellhead |
|
Mpa |
H2S content in the well |
|
% |
Number of days that plug can withhold the pressure of 70 Mpa or 35 MPa for |
not less than 30 |
days |
Full dissolution of the plug |
not longer than 90 |
days |
Chloride content in formation fluid |
3 |
% |
Type of kill fluid to create an additional safety barrier |
CaCl |
|
The maximum permissible density of the kill fluid (safety barrier above the plug) |
1.25 |
g/cm3 |